![]() For a burn rate of one 1 mB/t, the heating rate is: ![]() The actual value depends on the burn rate. The heating rate represents how much coolant is heated up per tick. ![]() The theoretical maximum burn rate is 1 mB/t per Fission Fuel Assembly in the reactor, but the effective maximum burn rate depends on a number of factors (see #Safe operation). It can be changed in the reactor's statistics tab. For a newly formed reactor, it is automatically set to 0.1 mB/t. The burn rate is the rate at which the reactor will burn Fissile Fuel. Output ports must be configured to the proper output type by crouching and right-clicking them with a Configurator. ![]() Some example control rod setups as seen from the top (C is for Fission Reactor Casing or Reactor Glass, R is for a control rod):Ī fission reactor requires at least 4 Fission Reactor Ports: Maximum control rod density can be achieved by placing them in a checkerboard pattern.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |